अमूर्त

Environmental impact assessment: Acase study of hydropower project

Bimlesh Kumar, Achanta Ramakrishna Rao


Although hydropower is very environmentally and economically sound project, it has effects on a local or regional scale. Present work addresses these issues and presents a viable procedural layout on environmental impact assessment (EIA) for implementing such project to the upcoming environmental engineers. The rapid impact assessment matrix (Pastakia, 1998) was used to get numerical impacts (adverse or beneficial) of different parameters. This method analyses and presents in a structured, friendly and transparent environment the numerous parameters and alternatives of an EIA. It considers all 4 components: physical/chemical, biological/ecological, social/cultural, economic /operational. Based on the analysis, it is shown that such a project will be positive economically but negative otherwise considering the other three components.


अस्वीकृति: इस सारांश का अनुवाद कृत्रिम बुद्धिमत्ता उपकरणों का उपयोग करके किया गया है और इसे अभी तक समीक्षा या सत्यापित नहीं किया गया है।

में अनुक्रमित

  • कैस
  • गूगल ज्ञानी
  • जे गेट खोलो
  • चीन राष्ट्रीय ज्ञान अवसंरचना (सीएनकेआई)
  • उद्धरण कारक
  • ब्रह्मांड IF
  • मियार
  • गुप्त खोज इंजन लैब्स
  • यूरो पब
  • यूनिवर्सिटैट डी बार्सिलोना
  • आईसीएमजेई

और देखें

Flyer